top of page

How Long Should You Wait Before Driving on Newly Sealed Asphalt Cracks?

  • premiumsealingct
  • Oct 10
  • 2 min read

Crack sealing plays a critical role in asphalt pavement maintenance. By filling and sealing cracks with a specialized rubberized sealant, you prevent water infiltration into the base and subgrade, which in turn protects against further damage like potholes or alligator cracking. But once the sealant is applied, how long do you need to keep traffic off it? That wait time is key to maximizing repair life and maintaining usability of the pavement.


What Is Crack Sealing?


Crack sealing involves applying a flexible, rubberized sealant, usually hot-applied, into cleaned and prepared pavement cracks. The sealant fills the gap and bonds to the walls of the crack, blocking moisture and allowing for natural thermal movement. Well-performed crack sealing can extend the service life of asphalt pavement for many years.


Typical Cure Time: What to Expect


Under normal conditions, modern crack sealants are designed to cool and harden relatively quickly. In ideal summer conditions, light vehicle traffic may be possible within 30-60 minutes, often by the time the crew leaves your property.


However, full cure and adhesion take longer. Industry guidance recommends allowing a minimum of two weeks before applying other surface treatments such as overlays, chip seals, slurry seals, or micro surfacing. If overbanded sealing (sealant applied wider than the crack) is used, even more time may be required. (roadresource.org)

In summary:

  • Initial set (cooling and hardening): often 30-60 minutes

  • Safe for light traffic: once the material is firm and no longer tacky

  • Full cure for overlays and treatments: at least 2 weeks (theasphaltpro.com)


Factor

Effect

Temperature

Under 100°F, sealant cools quickly. Over 100°F, the material stays soft longer and may require hours or even overnight before traffic is safe.

Humidity

Dry conditions allow faster curing. High humidity slows the process, sometimes adding hours before the surface is ready.

Thickness and Application

Thicker or overbanded applications take longer to cure than simple narrow crack fills.

Traffic Levels

Light traffic areas can reopen sooner. Heavy traffic areas need extra time to withstand pressure and friction.

Site Conditions

Shade, wind, and pavement temperature can all speed up or delay curing.


Why Waiting Matters


  1. Durability and Strength: Driving on uncured sealant can pull material from the crack and reduce adhesion, shortening the life of the repair.

  2. Appearance: Premature traffic may smear or deform the sealant, creating an uneven look.

  3. Safety: If the sealant is still tacky, it can stick to tires and track across the pavement or onto vehicles, especially on hot days.


Best Practices for Homeowners and Property Managers


  • Schedule smartly: Choose weekends, evenings, or low-traffic times to minimize disruption.

  • Follow professional guidance: Your contractor knows the specific product and conditions on site.

  • Watch the weather: Temperature and humidity directly affect set times.

  • Plan for overlays: Allow at least two weeks before applying any surface treatments on top of crack seal work.

 
 

Get Your Free Quote

For any questions, concerns, quotes, or to schedule an appointment, please fill out this form and we would be happy to assist you as soon as possible.
 

For immediate support, questions, or concerns, contact us directly by calling the numbers below during business hours.

Office: (203)-569-9450 

John: (203)-219-9536

Premium Sealing LLC Logo in square form

Premium Sealing Driveway & Masonry LLC © 2025 

304 Main Ave. #362

Norwalk, CT 06851

Hours of Operation

Mon - Fri: 8am - 6pm

​​Saturday: 8am - 5pm

​Sunday: Closed

  • X
  • Facebook
  • LinkedIn
bottom of page