How Long Should You Wait Before Driving on Newly Sealed Asphalt Cracks?
- premiumsealingct
- Oct 10
- 2 min read
Crack sealing plays a critical role in asphalt pavement maintenance. By filling and sealing cracks with a specialized rubberized sealant, you prevent water infiltration into the base and subgrade, which in turn protects against further damage like potholes or alligator cracking. But once the sealant is applied, how long do you need to keep traffic off it? That wait time is key to maximizing repair life and maintaining usability of the pavement.
What Is Crack Sealing?
Crack sealing involves applying a flexible, rubberized sealant, usually hot-applied, into cleaned and prepared pavement cracks. The sealant fills the gap and bonds to the walls of the crack, blocking moisture and allowing for natural thermal movement. Well-performed crack sealing can extend the service life of asphalt pavement for many years.
Typical Cure Time: What to Expect
Under normal conditions, modern crack sealants are designed to cool and harden relatively quickly. In ideal summer conditions, light vehicle traffic may be possible within 30-60 minutes, often by the time the crew leaves your property.
However, full cure and adhesion take longer. Industry guidance recommends allowing a minimum of two weeks before applying other surface treatments such as overlays, chip seals, slurry seals, or micro surfacing. If overbanded sealing (sealant applied wider than the crack) is used, even more time may be required. (roadresource.org)
In summary:
Initial set (cooling and hardening): often 30-60 minutes
Safe for light traffic: once the material is firm and no longer tacky
Full cure for overlays and treatments: at least 2 weeks (theasphaltpro.com)
Why Waiting Matters
Durability and Strength: Driving on uncured sealant can pull material from the crack and reduce adhesion, shortening the life of the repair.
Appearance: Premature traffic may smear or deform the sealant, creating an uneven look.
Safety: If the sealant is still tacky, it can stick to tires and track across the pavement or onto vehicles, especially on hot days.
Best Practices for Homeowners and Property Managers
Schedule smartly: Choose weekends, evenings, or low-traffic times to minimize disruption.
Follow professional guidance: Your contractor knows the specific product and conditions on site.
Watch the weather: Temperature and humidity directly affect set times.
Plan for overlays: Allow at least two weeks before applying any surface treatments on top of crack seal work.